Limske HPPs fulfilled the plans as well

12/4/2023
Excellent generation in the Branch Drinsko-Limske HPPs

The end of November was marked by excellent generation results in the Drinsko-Limske HPPs. Hydro Power Plant Bajina Bašta exceeded the cumulative annual fulfilment of the plan by almost 11 percent and reached this year's generation plan of 1,689,000 MWh on 28 November at midnight.

Bajina Bašta PSHPP fulfilled this year's production plan on 29 November at noon, generated 588,400 MWh of electricity and exceeded the cumulative annual fulfilment of the plan for that day by 15 percent. The fulfilment of the annual generation plan in both power plants was contributed by the favourable hydrological situation in the Drina basin, i.e. the significantly higher inflow of the Drina on the profile of Bajina Bašta HPP and the very good operational readiness of the production hydro units.

On 24 November, Zvornik HPP fulfilled the generation plan for 2023 of 528,000 MWh. As of 30 November of this year, Zvornik HPP generated a total of 546,418 MWh of electricity. Both Međuvršje and Ovčar Banja Hydro Power Plants, within the generation unit Elektromorava from Čačak, fulfilled the generation plan. By 30 November, they generated 71,734 MWh, which is 18 percent more than planned. The annual balance as of November for these two hydro power plants was 61,000 MWh.

In Limske HPPs, only Bistrica HPP ​​fulfilled this year's production plan by 30 November and the other hydro power plants are on the verge of achieving this. Excellent results in generation were achieved thanks to the favourable hydrological situation, the technical readiness of the units and the engagement of employees.

Top